Residential / Stellenbosch, Western Cape
A 640-bed student residence with study spaces and a communal courtyard, delivered before the academic year.
Client
Student accommodation developer
Sector
Residential
Location
Stellenbosch, Western Cape
Value
R150 million to R220 million
Duration
15 months
Status
Completed 2025
The developer needed 640 beds ready for the start of the academic year, which left no room for programme slip.
We used a design and build contract with a repetitive concrete frame and prefabricated bathroom pods, which reduced wet trades on site and sped up finishing.
Students moved in on schedule. Rooftop solar and heat pumps cut the building’s grid electricity use by an estimated 35 percent compared with a standard design.
640
beds delivered for the academic year
15 months
design and build programme
35%
estimated grid electricity saving
0
lost-time injuries



We had one non-negotiable date, the first day of term, and Ironveld planned the whole project around it.
Managing Director
Student accommodation developer
Tell us what you are planning and we will respond within one business day with next steps and, where possible, a budget estimate.
Building and civil engineering contractor in Cape Town since 1998. CIDB Grade 9 GB and 9 CE. ISO 9001, 14001 and 45001 certified.