Industrial / Brackenfell, Cape Town

Brackenfell Logistics Hub

A 42,000 square metre distribution centre with super-flat floors, 36 dock levellers and a solar-ready roof.

Client

Private logistics developer

Sector

Industrial

Location

Brackenfell, Cape Town

Value

R180 million to R250 million

Duration

13 months

Status

Completed 2024

Project overview

The challenge

The client needed a regional distribution centre ready for occupation before the peak retail season, on a site with variable ground conditions.

Our approach

We delivered the project under a design and build contract. Ground improvement, steel erection and floor slab pours were sequenced in overlapping zones so the building was weathertight within six months.

The outcome

The tenant moved in two weeks ahead of programme. The building achieved a 4-Star Green Star design rating, with rainwater harvesting and a roof designed for a 1.2 megawatt solar installation.

Scope of works

Results

2 weeks

ahead of programme

100%

within the agreed contract sum

0

lost-time injuries in 410,000 hours

4-Star

Green Star design rating

Project photographs

Empty steel-framed warehouse interior before racking installation
Steel roof beams being installed over the distribution centre
Excavator loading a dump truck during bulk earthworks

Ironveld gave us one point of contact from the first sketch to occupation. The building was ready two weeks early, which made our peak season possible.

Operations Director

Private logistics developer

Planning a similar project?

Tell us what you are planning and we will respond within one business day with next steps and, where possible, a budget estimate.

We value your privacy

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking "Accept All", you consent to our use of cookies.